We are offering

Outsourcing of projects in energetics

Our specialists offer knowledge and experience gained from a wide range of process technologies and projects undertaken in the past.

Reference contracts

Flue-Gas treatment on HOFOR BIO4 Power Plant project, Copenhagen, Denmark

Construction and commissioning of new semi-dry flue-gas treatment system (including condensation heat-recovery and auxiliaries) belonging to project of new biomass-fired power plant HOFOR BIO 4. Project was done in cooperation with LAB S.A.. Plant is designed as high-efficiency low carbon emissions power plant with special focus for city district heating. Project was done for Danish company HOFOR.

During start-up phase AUTCOM executed:

  • Loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Finalisation of Commissioning documentation

AUTCOM positions on project:

  • Field commissioning engineers (I&C/Electro/Mech.)
  • Electrical erection team for commissioning support
  • Lead electrical commissioning engineer for SIEMENS (separate mission for Steam turbine commissioning)

Flue-Gas Heat recovery (Condenser) system, Herning Power Station, Denmark

Construction and commissioning of new Flue-Gas Heat Recovery system on Herning Poer Station (1 unit) belonging to project of plant modernisation. Project was done in cooperation LAB S.A. (Process Plant supplier). Plant is designed as high-efficiency low emissions power plant with special focus for city district heating. Project was done for Danish company Ørsted as the final client.

During start-up phase AUTCOM executed:

  • Loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Commissioning of the DCS
  • Start-up technology – management of start-up group and operators of cold/hot commissioning and trial operation
  • Supervision of trial run

AUTCOM positions on project:

  • Lead commissioning engineer (Process, Controls)
  • Commissioning manager on behalf of LAB S.A.

Flue-Gas Treatment plant on new waste incineration plant AMAGER BAKKE, Copenhagen, Denmark

Construction and commissioning of new FGT plant (2 units) belonging to project of new waste incineration power plant Amager Bakke. Project was done in cooperation of Babcock-Wilcox Volund (2x boiler); LAB S.A. (Flue-Gas treatment) and SIEMENS (Steam Turbine). Plant is designed as high-efficiency low emissions power plant with special focus for city district heating. Project was done for Danish company RAMBOL and final client A-R-C.

During start-up phase AUTCOM executed:

  • Loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Commissioning of the DCS
  • Start-up technology – management of start-up group and operators of cold/hot commissioning and trial operation
  • Supervision of trial run

AUTCOM positions on project:

  • Lead commissioning engineer (Process, Controls)
  • Field commissioning engineers (I&C/Electro/Mech.)
  • DCS commissioning engineer
  • Commissioning shift operators

Relocation and modernisation of Power Plant Çan II 330 MW, Çanakkale, Turkey

First European Power plant that was successfully relocated from Voitsberg in Austria. AUTCOM’s contractual partner for commissioning works was Škoda Praha a.s.. Works started January 2017 and finished July 2018. The final client was ODAS Enerji Turkey.

During start-up phase AUTCOM executed:

  • Site management (Commissioning manager)
  • Loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Commissioning and Start-up of technology
  • HSE Support (safety coordinator)
  • Supervision of trial run

AUTCOM positions on project:

  • Commissioning manager
  • Commissioning HSE Officer/Coordinator
  • Boiler, Coal, and EPS Leading commissioning engineer
  • Field commissioning engineers (I&C/Electro/Mech.)
  • DCS commissioning engineer

Coal and Ash handling systems at new ADULARYA Yunus Emre 2x145MW CFPP project, Eskisehir, Turkey

AUTCOM was involved in design phase as an consultant for C&I systems on Coal and Ash handling system. The whole system was designed and delivered by Vitkovice Gear Works.

During start-up phase AUTCOM executed:

  • Preparation of commissioning test documentation
  • Cooperation on design final checks (I&C/Electro)
  • Complete cold-commissioning of equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Commissioning of the DCS
  • Hot commissioning of plant in cooperation with Vitkovice Gear Works
  • Start-up technology – management of start-up group and operators of cold/hot commissioning and trial operation
  • Supervision of trial run

AUTCOM positions on project:

  • Lead commissioning engineer (Coal handling)
  • Field commissioning engineers (I&C/Electro/Mech.)
  • DCS commissioning engineer (Coal handling)
  • Process commissioning engineer (Boilers)
  • Design engineer/advisor (I&C/Electro)
  • Documentation engineer/advisor (I&C/Electro)

HRSGs replacement (5 units) on power plant DUBAL, Dubai Aluminium, Dubai, United Arab Emirates

Complete replacement of 5 units of existing HRSGs for new 228 tons/hr HRSG units (retaining existing GE gas turbines) was done by Deutche Babcock – Bilfinger Babcock. Along with HRSG units the BOP systems (feed water system and electrical switch-yard) were replaced as well. The whole plant was integrated in to existing process steam distribution system. GE Mark VIe was used as DCS system for whole plant. New DCS was fully integrated in to existing plant control system. Whole project was done under supervision of L&T Sargent & Lundy.

During start-up phase AUTCOM executed:

  • Supervision of loop-check I&C equipment
  • Cooperation on design final checks (I&C/Electro)
  • Complete cold-commissioning of equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Commissioning of the DCS
  • Advisory for DCS issues against GE
  • Start-up technology – management of start-up group and operators of cold/hot commissioning and trial operation
  • Supervision of trial run

AUTCOM positions on project:

  • Senior DCS commissioning engineer/advisor
  • DCS commissioning engineer
  • Process commissioning engineer
  • Field commissioning engineers (I&C/Electro/Mech.)
  • Commissioning shift-operators (HRSGs/BOP)

Reconstruction of power station Ambarli Istanbul to combined cycle, Istanbul, Turkey

Reconstruction of units 40 and 50 to combined cycle with gas-oil SIEMENS turbine and HRSG Babcock Borsig Steinmüller (originally AE&E). Steam turbines were preserved original (ESCHER WYSS). There was implemented a complete replacement of piping, I&C equipment and DCS and a part of the machinery has been maintained. The contract was carried out between 2011 and 2012 in collaboration with EPP Ankara, SIEMENS Germany and BBS Brno. The final client was EUAȘ Ankara.

During start-up phase AUTCOM executed:

  • Supervision of loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment HRSG, gas turbines and BOP
  • Start-up technology – management of start-up group and operators of trial operation
  • Implementation of DCS in existing steam turbines (automatic warming through and start-up)
  • Supervision of trial run

AUTCOM positions on project:

  • Lead commissioning engineer (process)
  • Senior engineer (HRSGs + Steam turbine)
  • Field commissioning engineers (I&C/Electro/Mech.)
  • Field commissioning engineers (HRSGs/ST/BOP)
  • DCS specialist / advisor (HRSGs/ST/BOP)
  • Commissioning Shift Operators (HRSGs/ST/BOP)

Heating plant Slovnaft, Bratislava, commissioning FGD, Slovak Republic

Construction and start-up of new technology of wet desulphurization (2 units FGD) for boilers 1 to 8 with common operation of up to four boilers in one unit FGD. The contract was carried out between 2011 and 2012 in collaboration with Austrian Energy & Enviroment Graz, later Andritz Energy & Enviroment Graz, Austria.

During start-up phase AUTCOM executed:

  • Preparation of construction documents
  • Cooperation in loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Start-up of technology
  • Supervision of trial run

AUTCOM positions on project:

  • Process commissioning engineer
  • Field commissioning engineers (I&C/El./Mech.)
  • DCS commissioning engineer
  • Documentation officer

Power station Tušimice ETU2, construction and commissioning FGD, Czech Republic

Construction and start-up of new technology of wet desulphurization of units I., II., III. and IV. The contract was carried out between 2010 and 2011 in collaboration with Austrian Energy & Enviroment Graz, later Andritz Energy & Enviroment Graz, Austria.

During start-up phase AUTCOM executed:

  • Preparation of construction documents
  • Cooperation in loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Start-up technology
  • Supervision of trial run

AUTCOM positions on project:

  • Field commissioning engineers (I&C/Electro/Mech.)
  • DCS commissioning engineer
  • Commissioning shift operators

Power station Trianel - Lunen, new project of Benson boiler, Germany

Running and testing a new supercritical boiler for the block 750MW. The contract is implemented from 2011 up to now in collaboration with IHI, Japan and TRIANEL

During start-up phase AUTCOM executed:

  • Loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual tests of technological equipment
  • HSE Coordination (permit officers)
  • Commissioning and Start-up
  • Training of personnel of the final operator
  • Planned and emergency maintenance during the testing and trial run

AUTCOM positions on project:

  • Commissioning HSE Officer/Coordinator
  • Field commissioning engineers (I&C/Mechanical)
  • Commissioning shift operators

Power station Bandirma, Bursa, start-up of a new project CCPP, Turkey

Commissioning and testing the new 930MW combined cycle power station (2+1 configuration). The contract was carried out between 2010 and 2011 in collaboration with A-TEC, Austria and MHI, Japan. The final client was ENERJISA, Sabanci Group, Turkey.

During start-up phase AUTCOM executed:

  • Site management (Commissioning manager)
  • Loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Complete system tests DCS
  • Commissioning and Start-up of technology
  • HSE (permit officer and coordinator)
  • Supervision of trial run

AUTCOM positions on project:

  • Commissioning manager
  • Commissioning HSE Officer/Coordinator
  • Documentation officer/Coordinator
  • DCS commissioning engineer
  • Field commissioning engineers (I&C/Electro/Mech.)
  • Senior commissioning engineers (HRSG/Process)
  • Field commissioning engineers (BOP)
  • Commissioning shift operators

Power station Fiddlers Ferry, Warrington, commissioning FGD, England

Construction and start-up of new technology of wet desulphurization (FGD 3 units) for 500MW units 2 to 4. The contract was carried out between 2009 and 2010 in collaboration with Austrian Energy & Enviroment, Germany and Lentjes UK. The final client was SSE Perth.

During start-up phase AUTCOM executed:

  • Site management (Commissioning manager)
  • Loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Complete system tests DCS
  • Commissioning and Start-up of technology
  • HSE Support (safety coordinator)
  • Complete tests and guarantee measurements
  • Supervision of trial run

AUTCOM positions on project:

  • Commissioning manager
  • Commissioning HSE Officer/Coordinator
  • Leading commissioning engineer (Process)
  • Field commissioning engineers (I&C/Electro/Mech.)
  • DCS commissioning engineer

Power station Kemerkoy, Oren-Milas, commissioning FGD, Turkey

Construction and start-up of new technology of wet desulphurization (FGD 3 units) for 320MW units 1 to 3. The contract was carried out between 2001 and 2005 in collaboration with Babcock & Wilcox, USA. The final client was EUAȘ Ankara.

During start-up phase AUTCOM executed:

  • Loop-check I&C equipment
  • Individual tests of I&C equipment
  • Individual testing of electrical equipment
  • Individual tests of technological equipment
  • Complete system tests DCS
  • Commissioning and Start-up of technology
  • Complete tests and guarantee measurements
  • Supervision of trial run
  • Supervision of the Warranty period

AUTCOM positions on project:

  • Deputy Commissioning manager
  • Lead Commissioning engineer (Process)
  • Field Commissioning engineers (I&C/Electro/Mech.)
  • DCS commissioning engineer
  • Commissioning shift operators
  • Warranty period supervisor